Office & Workspace

further
projects

Project  /  New Office, Paddington

Client  /  Great Western Studios

Value & Duration  /  £5.5m - 48 weeks


This project involved strip out, demolition, temporary works and restricted headroom piling. The foundations and first floor frame of the new studio building were constructed within the envelope of an existing warehouse building adjacent the Grand Union Canal and the A40 Westway. The works included extensive mechanical and electrical fit-out and glass atrium walling, a fully glazed atrium roof was also provided. Grey water recycling, solar thermal hot water and areas of green roof were installed.

Project  /  Warehouse Freezer & Chillstore, Greenford

Client  /  Kuenhe + Nagel

Value & Duration  /  £4.0m - 16 weeks


This project involved converting an existing warehouse into a freezer and chill store for a major food logistics operator. The works included keeping existing operations within the building operational while the relocation and alteration works were carried out. New logistics offices, fuel island, vehicle wash and plant room were also provided. The existing office areas were also refurbished to create new operational areas.

Project  /  Office Fit-Out, Haymarket

Client  /  The Hub, Westminster

Value & Duration  /  £0.45m - 7 weeks


This project involved strip out of an existing office floor within the New Zealand High Commission followed by fit-out of the space to provide meeting rooms, lecture theatres, creative spaces, café areas and office space. Works were completed on time within seven weeks whilst working around strict noise and vibration restrictions imposed by the landlord. Existing mechanical services were retained and new lighting, power and fire alarm installations were installed with all services left exposed to create an industrial look.

Project  /  Control Tower & Airport Car Park, Southend

Client  /  London Southend Airport (Stobart Group)

Value & Duration  /  £3.0m - 28 weeks


This project involved both airside and landside construction operations on a busy regional airport. London Southend Airport has been developed in readiness for increased passenger flights as a result of the London 2012 Olympics. A new air traffic control tower was constructed alongside the existing runway, the works also involved construction of a new 500 space passenger car park to service the proposed new terminal and railway station. The construction of a new 130 foot tall tower within an operational commercial airport posed numerous challenges, our management team successfully dealt with the interface with the Civil Aviation Authority and Airport Management to deliver the project in the required timescales.